PLANNING
PROJECT TIMELINE
Phase 1
The Walk & Statue Revival
Phase 2
Artwork Curation and the Installation
Scope includes all the landscaping, hardscaping, irrigation, and lighting for the new Armenian Heritage Walk. This includes the trees, pavers, curbing, boulders, and flowers in the image above.
The complete revival of the "Young Meher" statue:
-
Full restoration of the statue and four relief panels
-
Existing statue base replaced with two solid granite blocks
-
Repositioning the statue ~25 feet east to its final position
-
Rotating the statue 90° to face east toward Armenia

BUILDING TIMELINE
Scope includes the design, creation, and installation of new artwork within each station of the Walk. The themes, style, geometry, material, and meaning behind each new piece of artwork is under development.

May
2024
Final Engineering Plans
July
2024
Building PermitsFinal Statue Revival Plan
August
2024
Material Procurement Begins
April
2025
Phase 1 Groundbreaking Construction Begins
April
2026
Phase 1 Unveiling